Excavator Placing Pipe
Courtesy SunWater Power Systems
An excavator lifting a 3,000-pound section of 8-inch steel onto a steep slope. The pipe was then pulled 500 feet up the hill using the excavator and a long steel cable through a pulley.
X
You may login with either your assigned username or your e-mail address.
The password field is case sensitive.
Loading